巜疯狂的少妇4做爰,国产精品成人国产乱,中文字幕在线观看亚洲日韩,亚洲精品成AV人片天堂无码,青青青在线视频国产,国产日韩成人内射视频,日出水了特别黄的视频,年轻的妺妺伦理HD中文,被部长玩的漂亮人妻,又硬又粗进去爽A片免费

航空翻譯_飛行翻譯_民航翻譯_藍(lán)天飛行翻譯公司

承接2018年12月4日版本空客公務(wù)機(jī) ACJ319 FCOM 和 QRH 翻譯任務(wù)

時(shí)間:2018-12-14 09:44來(lái)源:藍(lán)天飛行翻譯公司 作者:公務(wù)機(jī)翻譯 點(diǎn)擊:


[MEM] TCAS WARNINGS
[MEM] WINDSHEAR
[MEM] WINDSHEAR AHEAD
VENT
VENT AVNCS SYS FAULT
VENT BLOWER FAULT
VENT EXTRACT FAULT
VENT SKIN VALVE FAULT
WHEEL
[QRH] WHEEL TIRE DAMAGE SUSPECTED
WHEEL HYD SEL FAULT
WHEEL N/W STRG FAULT
WHEEL TYRE LO PR (If Installed)
WING A.ICE
WING A.ICE L(R) HI PR
WING A.ICE L(R) VALVE OPEN (Failure Detected in Flight)
WING A.ICE L(R) VALVE OPEN (Failure Detected on Ground)
WING A.ICE OPEN ON GND
WING A.ICE SYS FAULT (One Wing Valve Remains Closedwhen the Wing Anti-Ice Is Turned on)
WING A.ICE SYS FAULT (The Wing Anti-Ice Is Turnedon after One Engine Shutdown or after the Loss of One Bleed)
Detailed Cabin / Cockpit Evacuation Procedure Cockpit-AssignedDuties for Evacuation
Cabin Crew-Assigned Areas for Evacuation
Communications
On Ground Evacuation
Cockpit Evacuation through Window
Evacuation on Water
Normal Procedures
Standard Operating Procedures
General Information
Foreword
Flight Preparation
TechnicalCondition of the Aircraft
WeatherBriefing
NOTAMs
GPS PRIMARY Availability (If Installed)
Flight Plan and OperationalRequirements
Optimum Flight Level
Fuel Requirements
Safety Exterior Inspection
Safety Exterior Inspection
Preliminary Cockpit Preparation Aircraft Setup
Battery Check/Setup
APU Fire Test/APU Start
AIR COND
Cargo Heat (If Installed)
Cockpit Lights
EFB/ACARS (If Installed) Initialization
ECAM/LOGBOOK Check
Preliminary PerformanceDetermination
Operation EngineeringBulletins (OEB)
Before Walkaround
Exterior Walkaround Exterior Walkaround
Cockpit Preparation Overhead Panel
CTR Instrument Panel
Pedestal
RMP
ATC Datalink Communication
NAV Charts
FMGS Preparation
Glareshield
Lateral Consoles
Instrument Panels
ECAM Control Panel
ADIRS
TakeoffBriefing
PC Dedicated to Maintenance (If Installed)
Flow Pattern
Before Pushback or Start
Before Start Clearance
At Start Clearance
Engine Start
Automatic Engine Start
Ground Run Up - Danger Areas
After Start
After Start
Taxi
Taxi
Before Takeoff
Before Takeoff
Takeoff
Takeoff
After Takeoff
After Takeoff
Climb
Climb
Cruise
Cruise
Descent Preparation
Descent Preparation
Descent
Descent Initiation
Descent Monitoring
Descent Adjustment
Approach Checklist
000 ft Flow Pattern
Approach
Approach General
Introduction
Cross-Reference Table
Flying Reference
Stabilization Criteria
Approach Speed Technique
Discontinued Approach
Aircraft Configuration Management
航空翻譯 www.muluu.cn
本文鏈接地址:承接2018年12月4日版本空客公務(wù)機(jī) ACJ319 FCOM 和 QRH 翻譯任務(wù)